BMP Conversion

Best management practices (BMPs) are methods for reducing soil erosion, which in turn help improve water quality. These are often temporary installations. Once a project reaches its final stage, these temporary devices or structures may require conversion to more permanent solutions. Using engineered plans, Eco Turf executes these BMP conversions at a competive price and per the applicable regulatory requirements.

Check out pics from recent projects:

Bioretention Pond Conversion completed at the Durham EPA Annex in May 2014

Fully converted Water Quality Pond (WQP) project we completed in March 2014

 

Project: Bioretention Pond Conversion completed at the Durham EPA Annex in May 2014
Application: Bioretention areas are a useful option for stormwater quality control on small development sites and where safety and aesthetics are a concern.

Bioretention Pond

 

Project: Water Quality Pond (WQP) project completed in March 2014

WQP conversion